Staining Stair Parts, Cont’d…

Day 2 of staining the parts of our new stair system involved a lot of repetitive motion. After the wood stain had completely dried on the stair treads, I coated them all with gloss polyurethane. The poly should be applied in thin, successive coats and allowed to completely dry between coats.

Before applying a new coat, the previous coat of poly should be hand-sanded with 220-grit in the direction of the wood-grain. This light sanding strengthens the bond between coats and helps ensure a smooth, even finish. Use a tack cloth to wipe away the sanding dust before applying the next coat. The poly should be applied to all sides and edges of the stair treads. To achieve a nice, durable finish that will stand up to foot traffic, the treads need a minimum of three coats of polyurethane.

Along with the stair treads, I gave the cherry newel posts from L.J. Smith Stair Systems the same treatment of wood stain and polyurethane finish.

This particular project required two full newel posts plus a half-newel that will be mounted against a wall on the upper stair landing. A half newel is exactly what it sounds like — a stair post split lengthwise down the middle.

Next come the wooden handrails, which get stained and finished to match the treads and posts.

I’ve got a long way to go on this project, so check back here for further updates.

— M. Weber

 

Hot Product

Surebonder Holiday Light Tacker
SUREBONDER Holiday Light Tacker

‘Tis the season when this Holiday Light Tacker is top of mind for our Hot Product feature. The Surebonder Holiday Light Tacker Manual Staple Gun makes hanging those holiday light displays easier and safer throughout the Holiday season. This staple gun has many features that set it apart and make it the ideal staple gun […]

Read More >>