How Soon to Paint Concrete?

Q.  I just repaired a concrete wall. How long should I wait before painting it?

A.  Typically most paint manufacturers will allow a latex based paint to be applied after 7 days of curing. All oil-solvent based stains and epoxy materials will need to wait 28 days. Always check for the paint manufacturer’s recommendations.

Hot Product

Trex® Seal™ Sub-Ledger Tape
Trex® Seal™ Sub-Ledger Tape

Waterproofing the ledger board is a critical step in preventing moisture damage and ensuring the structural integrity of a deck over time. To fully protect this essential component, the makers of Trex® Seal™ Ledger Tape have introduced a new butyl tape engineered specifically for use beneath the ledger board. Measuring 22 inches wide, Trex® Seal™ […]

Read More >>