How Long Should Concrete Cure?

Q: I’m about to pour a new sidewalk. How long should I let the new concrete cure before walking on it?

A: Generally speaking, concrete and other Portland cement-based products should be moist-cured for at least 5 to 7 days. Check the product packaging for specific instructions. One alternative to moist-curing is using an Acrylic Concrete Sealer. Applied at the appropriate time, this will help the concrete cure properly while sealing it against stains that tend to penetrate the surface of the concrete. Note: An acrylic concrete sealer should not be used in temperatures below 50 degrees F or when rain is expected within a few hours.

 

Hot Product

Bigfoot Footing Forms
Bigfoot Systems Footing Forms

  The best footing tube base & pier footing tubes available today are made by Bigfoot Systems®. The Bigfoot team has been in the construction business for many years and has developed a variety of Bigfoot products for all your construction needs. Rigid plastic footing forms are alternatives to conventional forming methods for concrete pier […]

Read More >>