How long should I Cover a New Concrete Slab for it to Cure Properly?

Q: How long should I cover a new concrete slab for it to cure properly?

 

A: The longer concrete stays damp after it’s poured, the stronger it will be. Cover it with plastic or damp cardboard for a minimum of three days. A week is even better. For large slabs there is even some benefit at 28 days. In dry weather, mist the concrete surface several times a day and keep it covered to retain the moisture. If you’ve added pigment to the concrete, then apply a curing compound, which helps to prevent stains that appear when tinted concrete dries unevenly.

Hot Product

Trex® Seal™ Sub-Ledger Tape
Trex® Seal™ Sub-Ledger Tape

Waterproofing the ledger board is a critical step in preventing moisture damage and ensuring the structural integrity of a deck over time. To fully protect this essential component, the makers of Trex® Seal™ Ledger Tape have introduced a new butyl tape engineered specifically for use beneath the ledger board. Measuring 22 inches wide, Trex® Seal™ […]

Read More >>