How Long Should Concrete Cure?

Q: I’m about to pour a new sidewalk. How long should I let the new concrete cure before walking on it?

A: Generally speaking, concrete and other Portland cement-based products should be moist-cured for at least 5 to 7 days. Check the product packaging for specific instructions. One alternative to moist-curing is using an Acrylic Concrete Sealer. Applied at the appropriate time, this will help the concrete cure properly while sealing it against stains that tend to penetrate the surface of the concrete. Note: An acrylic concrete sealer should not be used in temperatures below 50 degrees F or when rain is expected within a few hours.

 

Hot Product

Trex® Seal™ Sub-Ledger Tape
Trex® Seal™ Sub-Ledger Tape

Waterproofing the ledger board is a critical step in preventing moisture damage and ensuring the structural integrity of a deck over time. To fully protect this essential component, the makers of Trex® Seal™ Ledger Tape have introduced a new butyl tape engineered specifically for use beneath the ledger board. Measuring 22 inches wide, Trex® Seal™ […]

Read More >>