Basement Bath, Demolition and Prep Work Before Rough-In
Wallboard, paneling, acoustic tiles and linoleum flooring all had to go before the basement bath project could begin. Looking at the room for the first
Wallboard, paneling, acoustic tiles and linoleum flooring all had to go before the basement bath project could begin. Looking at the room for the first
MULE is taking outdoor comfort to the next level with the F5 Wet-Rated Ceiling Fan—its first fully wet-rated fan, built to withstand rain, humidity, and the elements. With 6,400 CFM of powerful airflow and quiet operation, this 54” ceiling fan is perfect for outdoor patios, pergolas, and even indoor spaces. Equipped with a 6-speed remote […]
Read More >>